Highway 122

Module Details
Type
Transition
Owner
Shane Lambert
Status
Construction
Operational by
November 2017
Size
4 feet by 26 inches
MSS Status
Cascade Wired
Industries
0 with 0 spots

Highway 122 is currently in the construction stages but will become the second of two transition (2-to-1) modules. This  will be a four foot long module using a #10 turnout for the transition. Highway 122 will feature a two-lane divided highway passing under the double track portion of the module though a tunnel. 

 

Track Diagram

Download Cad Drawing

Progress on Highway 122

   May, 7th, 2015  

With the growing collection of modules in the group, some single and some double track, it is has become clear that the group will need a couple of transition, or 2-to-1 modules. These modules will be single track on one end and double track on the other. It has long been my intention to build a pair of these, and… Read more »

Leave a Reply